Skip to menu Skip to content

Construction orders - 3. quarter of 2005

Interannual decrease of new orders of the civil engineering works

Publication Date: 24. 11. 2005

Product Code: r-8204-05




New construction work orders
 
In the 3 rd quarter  2005 construction enterprises contracted 28, 482 new construction work orders, worth about CZK 78.0 billion, which translates into a decrease of 7.7 % y-o-y. The decrease was partially influenced by the high reference basis of the 3 rd quarter of 2004. Also change of structure expressed thanks considerable decrease of new orders in the civil engineering works.
 
By types of construction the volume of new domestic orders:
-          increased in the water management works by 39.9 %;
-          increased in the construction of non-residential buildings not designed for production by 34.5 %;
-          increased in residential buildings by 23.5 %;
-          increased in the construction of non-residential buildings designed for production  by 16.8 %;
-        decreased in the civil engineering works by 35.4 %.

Graph Development of new construction work orders

      The average value of domestic new construction work orders was CZK 2.7 million and decreased  
by 21.1 % y-o-y.
Public and private new construction orders amounting to CZK 45.6 billion (58.4 %) and CZK 32.4  billion (41.6 %) respectively. The number of new work orders is 28, 482 most of them are private  orders  58.6 %. 
 
      The value of construction work orders cancelled in the 3 rd quarter 2005 was CZK 0.6 billion.
 
      The volume of construction work order
 
The linear relation between volume of construction order and construction enterprises exists. Primarily the big enterprises realise big construction orders, which are capable of guarantying of construction complexly on technology level.
 

Number of employees
Construction work orders 3 rd quarter 2005 in the CR
Total
Share of orders of public sector %
Volume                    (CZK million)
Number
Average size of order (CZK million)
Volume
Number
1000 a více
102 216
1 831
55.8
76.9
64.3
500 - 999
35 206
986
35.7
82.5
62.0
400 - 499
4 216
294
14.3
50.9
50.3
300 - 399
7 103
503
14.1
44.5
63.2
200 - 299
22 215
1 438
15.4
72.4
51.0
100 - 199
12 325
3 255
3.8
53.6
32.6
75 -  99
7 356
1 625
4.5
43.1
43.8
50 -  74
7 488
3 285
2.3
49.8
52.1
25 -  49
8 891
4 386
2.0
42.8
34.7
20 -  24
2 860
2 746
1.0
31.6
23.8
Total
209 876
20 349
10.3
70.2
42.5

 
The progress schedule for completion of construction work orders in the CR
 
From the total number of orders 20.3 thousands it will be realised 94.3 % in next 12 months, which is much the same y-o-y. This indicator move above 90 % in the long term. During the next first 6 months it will be realised 81.9 % from total number work orders.
 
From the total value of orders amounting to CZK 209.9 billion it will be realised 72.2 % in next 12 months, in comparison with 3 rd quarter 2004 it is increase about 4.2 point. During the next first 6 months it will be realised  42.8 % from total value work orders.
 

Completion
2004
2005
1. Q
2. Q
3. Q
4. Q
1. Q
2. Q
3. Q
The number of orders at 3 rd quarter 2005 %
  In next 12 months
95.0
93.8
94
93.9
94.8
95.0
94.3
  - In next 6 months
81.1
80.9
80.7
79.6
81.5
82.6
81.9
  In 13 and next months
5.0
6.2
6.0
6.1
5.2
5.0
5.7
The value of orders at 3 rd quarter 2005 %
  In next 12 months
72.0
66.6
68.0
66.0
69.6
73.7
72.2
  - In next 6 months
44.9
44.8
42.8
39.4
42.8
47.4
42.8
  In 13 and next months
28.0
33.4
32.0
34.0
30.4
26.3
27.8


 
Note:
Contact: Vladimír Zikmund, phone 274 054 252, e-mail: vladimir.zikmund@gw.czso.cz
Data source: CZSO direct survey in enterprises
End of data collection: 11 November 2005
End of data processing: 22 November 2005
The data will be revised in the processing for the 4 th quarter 2005.
Related publications:        /1-ep-8    
                                         8203-05 Construction Work Orders
---
Not edited for language