Construction - methodology

Contents
 
      Since 1997, construction enterprises based in the Czech Republic have been including enterprises with construction as prevailing activity, classified to Division 45 of the national Branch Classification of Economic Activities (CZ-NACE) and split as follows:

a) construction enterprises with 20 employees and over,

b) construction enterprises with fewer than 20 employees and natural persons with trade licence as per Act No. 455/1991 Coll., for which monthly estimates are made. (Before 1997, the enterprises were split into two sizes groups: those with 25 employees and over and those with fewer than 25 employees).

      Construction work refers to work done on construction, reconstruction, extension, renovation, repair and maintenance of permanent or temporary buildings and structures. Also included is the work related to the erection of constructions and the value of built-in material (work classified to Division 45 of CZ-NACE).

      Construction work according to delivery contracts (S) comprises all work done by construction contractors for their customers, including work done by sub-contractors. This indicator is thus the sum of all outputs (i.e. of construction work based on delivery and sub-delivery contracts carried out for final users) achieved by both contractors and sub-contractors and invoiced by the contractor to the final user.

      New construction comprises the value of work which produces new tangible fixed assets (especially buildings and structures) acquired by final users.

      Reconstruction and modernization comprise extensions of and building modifications to tangible fixed assets; they change the original purpose or technical parameters of the assets or expand their use and/or provide them with better amenities.

      Repairs and maintenance include construction work carried out to ensure that buildings and structures maintain the function they have been designed for.

      Other construction work embraces all construction work that cannot be classified as work on new constructions or repairs. It includes, e.g., demolition work on sites where no construction work will follow, work performed for technical development or geological surveys, and stripping as well as surcharges for engineering activities and, as the case may be, other surcharges.

      Construction work by type of construction:

-  residential buildings - include multi-dwelling buildings (buildings mainly designed for housing); the item corresponds to the sub-categories of the national Standard Classification of Production (CZ-CPA) 45.21.11 and 45.21.12;

-  non-residential buildings not designed for production - include all non-residential non-production buildings such as hospitals, sanatoria, schools, office buildings (including those used by production, agricultural, trading and other companies); the item corresponds to CZ-CPA sub-categories 45.21.16 to 19, 45.21.61 to 63;

-  non-residential buildings designed for production - include all non-residential production buildings (for industry, agriculture, transport, communications, etc.); they correspond to CZ-CPA sub-categories 45.21.13 to 15, 45.21.51, 45.21.64 and 45.25.61;

-  civil engineering works - the item corresponds to CZ-CPA sub-categories 45.21.21 and 22, 45.21.31 to 37, 45.21.41 to 46, 45.21.52, 45.23.11 to 14, 45.23.21 and 22, 45.25.22;

-  water management works - the item corresponds to CZ-CPA sub-categories 45.24.11 to 13.

      Average registered number of employees comprises all categories of permanent, seasonal and temporary employees who have an employment contract with a construction enterprise. Persons employed temporarily are included since the day they were taken on.

       The overview on employees and average monthly gross wages excludes women on maternity leave.

Notes on Tables

       The data in Tables 17-1 to 17-3 refer to all construction enterprises. Between 2000 and 2002, the CZSO ran additional statistical surveys and the whole time series of the data was revised accordingly. Tables 17-4 to 17-14 give data on enterprises with 20 employees and over.

      The data for 1999 to 2001 listed in Table 17-4 and subsequent tables are from submitted questionnaires only, while those for 2002 and 2003 also include estimates for non-response.

Table 17-9. Construction work orders

      The figures listed result from the processing of questionnaires designed for enterprises classified to CZ-NACE Groups 451 and 452 - i.e. for enterprises carrying out construction work which is main construction production in nature. They provide information on trends in the construction market, revealing customers´ interests and, consequently, the future structure of construction work. In relation to the reporting units they represent „a supply of work“ in the nearest future, also giving information on changes in the whole structure of orders.

Tables 17-16 to 17-24. Housing construction

      The tables offer information on the total number of dwellings started, completed and under construction, attained by all forms of construction. The year 1996 was the last to see the measuring of the forms of construction of dwellings under the methodology in force for the time series up to 1995. Since 1996 only aggregate data (dwellings completed, total) follow up the data for previous years. Their comparing with data published up to 1995 requests that no dwellings obtained by adaptation of non-residential rooms are included in the whole. There is no doubt that such projects were implemented in the past, too, but the Czech Statistical Service did not collect data on such dwellings before 1997. The numbers of completed dwellings are measured by census once a year and embrace dwellings in and outside constructions for housing, including all types of extensions, dwellings in community care service homes and boarding houses, and dwellings in non-residential buildings (but excluding dwellings obtained by conversion of non-residential rooms).

      Constructions for housing are multi-dwelling buildings in which the function of housing prevails, plus family houses. Also included in this indicator are numbers of dwellings obtained by extensions of existing constructions for housing.

      Family house is a construction in which over half of the floor area of all rooms is designed for living. Each family house can have a maximum of three independent dwellings, not more than two storeys above the ground, and an attic. Any common auxiliary rooms and spaces are not taken into account.

      Multi-dwelling building is a construction in which more than half of the floor area of all rooms is designed for living and the number of independent dwellings is 4 or more; the number of storeys makes no difference.

      Dwelling refers to one or more rooms designed for living by the planning and building control authority, which can serve as independent dwelling units for this purpose. The number of dwellings includes separate rooms in hostels, homes for students and young workers, and boarding houses not managed by local authorities.

      Dwellings started are dwellings in a building whose erection was started in the reference period, as laid down in the construction book, irrespective whether or not these dwellings have been completed. For this purpose, the building refers to a family house, multi-dwelling building and extensions to them, community care service home and boarding house, non-residential building (tied dwellings provided by employers usually outside residential buildings), and any room(s) whose conversion provides a new dwelling.

      Dwellings completed are dwellings which in compliance with the Building Act No. 50/1976 Coll., as last amended have been approved by the planning and building control authority as duly finished and ready for use.

       Dwellings under construction at the end of the reference period are dwellings whose construction was already begun but not yet finished by the end of the reference period.

      Top extension, side extension and built-in extensionare building modifications to a dwelling house or family house which result in new dwellings. the top extension always and the built-in extension sometimes expand the volume of the construction, maintaining its plan view, while the side extension extends the plan view, maintaining the height of the construction.

      Community care service homes and boarding houses are special multi-dwelling buildings whose technical facilities also include community care service rooms (the former) or which allow renting furnishings of dwellings with housing services (the latter).

       Dwellings in non-residential buildings are tied dwellings for employees whose presence in the building is necessary for operation and/or security. They are located in other than residential buildings.

      Conversion of non-residential rooms into dwellings includes building modifications to non-residential rooms in residential and non-residential buildings, which increases the number of dwellings (but not as a result of new construction).

      Cooperative housing construction produces dwellings in residential buildings erected housing cooperatives (either by self-help or through a contractor).

      Municipal housing construction refers to the construction of dwellings in tenement residential buildings; it is a responsibility of municipalities.

      Other housing construction includes:

a) dwellings in corporate construction of multi-dwelling buildings, funded by the enterprises,

b) part of tied dwellings located in residential buildings, designed for employees whose presence in such a building is necessary for operation and/or security,

c) dwellings in residential buildings implemented by natural or legal persons and not included in the other forms of housing construction.

      Enclosed volume of the house is the sum of the enclosed volumes of foundations (cubic metres of foundation structures), plus lower and upper parts of the building plus roofing (delimited by the outside surface areas of the shell structures, the bottom level of the floor structure and the outside surface areas of the roof).

      Habitable floor area is the floor area of habitable rooms. The habitable room is a directly lit and ventilated room of at least 8 m2 in floor area which can be directly or sufficiently indirectly heated and which is designed and equipped for-year-round occupation. The floor area of such a room excludes the floor area of auxiliary rooms (entrance hall, non-residential hall, larder and other unoccupied rooms designed for use together with the dwelling). Excluded from the auxiliary rooms are cellar, washroom, inhabitable attic or garage, as well as conveniences (toilet, bathroom, shower and larder).

      Useful floor area of a dwelling is the area of all habitable and auxiliary rooms, including conveniences of the dwelling. Cellars, washrooms and inhabitable attic room are not included. Garages are included, if located in the non-residential room.

      Time of construction is the time elapsed between the start of construction work on the project and the completion of the dwelling.

      Value of buildings is given by the so-called „combined price“ and is equal to the sum of values at current prices in force in individual years of construction.

      Dwelling that ceased to exist as dwelling is a dwelling declared by the planning and building control authority to serve other than housing purposes, or to be demolished.

Tables 17-25 and 17-26. Building permits granted and the estimated value of constructions for which building permits were granted

      In 1993 to 1999 the data were measured quarterly and then monthly (since 1999) in an exhaustive manner - i.e. for the whole universe of reporting units. The universe is composed of all planning authorities, as stipulated by the Act No. 50/1976 Coll., on Town and Country Planning and Building Code (Building Act).

      Under the Act above, building permit lays down binding conditions for the implementation and use of the construction.

      Estimated value of constructions includes all costs incidental to the preparation, implementation, and commissioning of a construction project.

Table 17-28. Financial indicators of construction enterprises

      The coverage of the individual indicators corresponds to the items of the profit and loss account and the balance sheet. Individual accounts, groups of accounts and account classes correspond to the chart of accounts for entrepreneurs.


_____________

      The data on dwellings (started, completed and under construction) also include dwellings obtained by conversion of non-residential rooms since 2002. The other data are fully comparable with the data shown in the statistical yearbooks of previous years.


*    *    *

      Other data are available in the following CZSO publications regularly brought out in accordance with the CZSO Catalogue of Publications 2004 (group 8 - INDUSTRY, CONSTRUCTION, subgroup 82 - Construction):

-   “Building Permits Granted” (Czech-English version) – monthly, on the 50th calendar day
-   “Construction Work Orders” (Czech-English version) – quarterly, on the 60th calendar day
-  
„České stavebnictví v číslech 2003“ – June 2004
-   “Housing Construction” (Czech-English version) – quarterly, on the 60th calendar day
-  
„Stavby pro bydlení dokončené v roce 2003” – June 2004.

 
© Czech Statistical Office, 2004